Author Details

Hidayat, Narwan, Universitas Muhammadiyah Sumatera Utara, Medan, Indonesia

  • Vol 1, No 2 (2019): on progres - Articles
    STUDI OPTIMASI WAKTU DAN BIAYA ALAT BERAT PADA PEKERJAAN PONDASI DENGAN METODE TIME COST TRADE OFF PADA PROJECT PEMBANGUNAN TERMINAL LPG PRESSURIZED 4 X 3000 MT MEDAN-BELAWAN
    Abstract  PDF