| Issue | Title | |
| Vol 1, No 1 (2019): January - Juni | Analisis Kinerja Dan Pengaruh Tata Letak Bresing Eksentris Pada Sistem Rangka Bresing Eksentris (SRBE) Tipe-D Pada Bangunan Setback Vertikal | Abstract PDF |
| Tondi Amirsyah Putra, Fahrizal Zulkarnain | ||
| Vol 1, No 2 (2019): on progres | ANALISIS MEKANIS BETON BUSA DENGAN KOMBINASI SERAT SABUT KELAPA SERTA BAHAN TAMBAHAN ABU SEKAM PADI DAN SERBUK CANGKANG TELUR | Abstract PDF |
| Fetra Venny Riza, Deni Sapriandi Lubis, Fira Vidia Br. Manurung | ||
| Vol 1, No 2 (2019): on progres | ANALISIS RESOURCE LEVELING MENGGUNAKAN NETWORK PLANNING PADA PEMBANGUNAN RUSUNAWA INSTITUT TEKNOLOGI PADAN | Abstract PDF |
| Dyla Midya Octavi, Angri Wahyudi, Citra Utami | ||
| Vol 1, No 1 (2019): January - Juni | Analisis Waktu Tunggu Kapal Kontainer Pada Dermaga Antar Pulau Dengan Fasilitas Bongkar Muat Crane (Studi Kasus) | Abstract PDF |
| Hendarmin Lubis | ||
| Vol 1, No 1 (2019): January - Juni | DAMPAK PEMBANGUNAN PUSAT PERBELANJAAN DAN APERTEMEN BARU TERHADAP LALU LINTAS | Abstract PDF |
| Andree Andika | ||
| Vol 2, No 1 (2020): Januari - Juni | EVALUASI BIAYA OPERASIONAL KENDARAAN UNTUK TARIF ANGKUTAN ANTAR KOTA STABAT-BINJAI | Abstract pdf |
| Andri Andri, Zurkiyah Zurkiyah, Fajar A P. | ||
| Vol 1, No 1 (2019): January - Juni | EVALUASI DIMENSI SALURAN DRAINASE PADA KAWASAN KELURAHAN SEI KERA HULU KECAMATAN MEDAN TEMBUNG KOTA MEDAN | Abstract PDF |
| Hendarmin Lubis | ||
| Vol 2, No 1 (2020): Januari - Juni | IDENTIFIKASI LOKASI RAWAN KECELAKAAN LALU LINTAS PADA JARINGAN JALAN DI KOTA TEBING TINGGI DENGAN METODE BATAS KONTROL ATAS DAN UPPER CONTROL LIMIT | Abstract PDF |
| Irma Dewi, Almaida Almaida | ||
| Vol 1, No 1 (2019): January - Juni | PEMANFAATAN AIR HUJAN DARI ATAP BANGUNAN SEBAGAI SOLUSI MENGHEMAT PEMAKAIAN AIR PDAM PADA GEDUNG PERKANTORAN DI KECAMATAN MEDAN BELAWAN | Abstract PDF |
| Hendarmin Lubis | ||
| Vol 2, No 1 (2020): Januari - Juni | PENGARUH GEOMETRIK JALAN TERHADAP KECELAKAAN LALU LINTAS RUAS JALAN SOEKARNO-HATTA BINJAI | Abstract pdf |
| Irma Dewi, Jefri R. F. | ||
| Vol 2, No 1 (2020): Januari - Juni | PENGARUH KARAKTERISTIK PENUMPANG TERHADAP KAPASITAS ANGKUT KERETA API JURUSAN MEDAN-RANTAU PRAPAT | Abstract PDF |
| Andri Andri, Erifan Armanda Putra | ||
| Vol 2, No 1 (2020): Januari - Juni | PENGARUH PENAMBAHAN ETHYLENE VINYL ACETATE PADA ASPAL PENETRASI 60/70 TERHADAP KARAKTERISTIK CAMPURAN LASTON AC-BC | Abstract PDF |
| Muhammad Husin Gultom, D. Akbar | ||
| Vol 1, No 2 (2019): on progres | PENGARUH PENAMBAHAN TEBAL PADA BASE PLATE DENGAN DAN TANPA PENGAKU (STIFFNERS) TERHADAP MOMEN-ROTASI | Abstract PDF |
| Tondi Amirsyah Putera, Aldrin Dhio Pratama | ||
| Vol 1, No 1 (2019): January - Juni | PENGARUH PERATURAN GEMPA 2012 TERHADAP VOLUMETRIK TULANGAN PAKAI PADA GEDUNG DENGAN DINDING GESER DI KOTA BANDA ACEH | Abstract PDF |
| Tondi Amirsyah Putra | ||
| Vol 1, No 2 (2019): on progres | PERBANDINGAN SIMULASI GAYA AKSIAL DAN LATERAL PLAIN WALL BETON RINGAN ANTARA CAMPURAN STYROFOAM DENGAN LAPISAN COATING DAN ABU SEKAM PADI DENGAN FLY ASH | Abstract PDF |
| Josef Hadipramana, Jaka Syahputra | ||
| Vol 1, No 1 (2019): January - Juni | PERENCANAAN GEOMETRIK RAMP PADA JUNCTION DAN INTERCHANGE JALAN TOL MEDAN KUALANAMU TEBING TINGGI (SEKSI 3 DAN 4B) | Abstract PDF |
| Redha Ayu Cressha Ningrum | ||
| Vol 1, No 1 (2019): January - Juni | PERILAKU NONLINEAR STRUKTUR GEDUNG BAJA DENGAN BENTUK DENAH L, T DAN U AKIBAT GEMPA | Abstract PDF |
| Ade Faisal | ||
| Vol 2, No 1 (2020): Januari - Juni | SHAKING TABLE STUDY AND MODELLING OF SMALL SCALE BUILDINGS UNDER SEISMIC LOADING FOR EDUCATIONAL PURPOSE ANALYSIS | Abstract PDF |
| Noor Sheena Herayani Harith, Aishah Humira binti Bubin | ||
| Vol 1, No 2 (2019): on progres | STUDI KESELAMATAN DAN KEAMANAN TRANSPORTASI DI PERLINTASAN SEBIDANG ANTARA JALAN REL DENGAN JALAN UMUM (Studi Kasus Perlintasan Kereta Api Di Jalan Padang, Bantan Timur, Kecamatan Medan Tembung) | Abstract PDF |
| Sri Asfiati, Dinda Tri Mutiara | ||
| Vol 1, No 2 (2019): on progres | STUDI OPTIMASI WAKTU DAN BIAYA ALAT BERAT PADA PEKERJAAN PONDASI DENGAN METODE TIME COST TRADE OFF PADA PROJECT PEMBANGUNAN TERMINAL LPG PRESSURIZED 4 X 3000 MT MEDAN-BELAWAN | Abstract PDF |
| Zurkiyah Zurkiyah, Narwan Hidayat | ||
| Vol 1, No 1 (2019): January - Juni | STUDI POTENSI DAERAH GENANGAN BANJIR DAS BELAWAN DENGAN SISTEM INFORMASI GEOGRAFIS (SIG) | Abstract PDF |
| Mizanuddin Sitompul | ||
| 1 - 21 of 21 Items | ||