STUDI OPTIMASI WAKTU DAN BIAYA ALAT BERAT PADA PEKERJAAN PONDASI DENGAN METODE TIME COST TRADE OFF PADA PROJECT PEMBANGUNAN TERMINAL LPG PRESSURIZED 4 X 3000 MT MEDAN-BELAWAN

Zurkiyah Zurkiyah, Narwan Hidayat

Abstract


In planning a project in addition to the time and resource variables, the cost variable has a very important role. Cost (cost) is one of the important aspects in management, where the costs incurred must be controlled to a minimum. Cost control must pay attention to the time factor, because there is a close relationship between the project completion time and the project costs concerned. The delay in the foundation erection work for the Medan-Belawan LPG pressurized tank was a cost management or control error. It is known that the initial cost needed to operate the hydraulic jack heavy equipment and service crane on the foundation work is IDR 1,960,200,000 with a total of 480 points from 4 sub jobs. Then by using the time cost trade off method in the construction project of the LPG Pressurized 4x3000 MT terminal in Medan-Belawan, the results of the analysis show the productivity value of the Hydraulic Jack (vibratory pile driver) and service crane on foundation work in the 4x3000 MT presurrized LPG terminal construction project which is equal to 0.75% because 1 HSPD tool can stake 6 piles and within the time frame of the work in the construction is 8 hours / day. Then after analyzing it, it is known that the amount of costs required to add tools for operation of the foundation work is IDR 1,729,348,000

Full Text:

PDF

References


Afifuddin, M., & Rani, H. A. (2015). Analisa Waktu Dan Biaya Dengan Menggunakan Metode Time Cost Trade Off (Studi Kasus: Proyek Lanjutan Pembangunan Gedung Dprk Aceh Timur Tahap I). Jurnal Teknik Sipil, 4(3), 241248. https://doi.org/10.24815/jts.v4i3.12404 Ardika, O. P. C., Sugiarto, & Handayani, F. S. (2014). Analisis Time Cost Trade Off dengan Penambahan Jam Kerja pada Proyek Konstruksi (Studi Kasus: Proyek Pembangunan Jalan Tol Bogor Ring Road Seksi II A). E-Journal Matriks Teknik Sipil, (September), 273280. Aslam, A., Indriyani, R., Sipil, J. T., Teknik, F., Teknologi, I., Nopember, S., Hakim, R. (2015). Analisa Time Cost Trade Off pada Proyek Pasar Sentral Gadang Malang. 4(1). Di, P., Lampung, B., Ma, A., & Mela, A. F. (2016). Analisis Time Cost Trade Off Untuk Mengejar Keterlambatan Pelaksanaan. Jurnal Rekayaa, 20(1). Dwiretnani, A., & Daulay, I. A. (2019). Kinerja Alat Hydraulic Static Pile Driver (HSPD) Pada Proyek Perluasan Terminal Bandara Sultan Thaha Jambi. Jurnal Talenta Sipil, 2(2), 67. https://doi.org/10.33087/talentasipil.v2i2.20 Frederika, A. (2010). ANALISIS PERCEPATAN PELAKSANAAN DENGAN MENAMBAH JAM KERJA OPTIMUM PADA PROYEK KONSTRUKSI (Studi Kasus: Proyek Pembangunan Super Villa, Peti Tenget-Badung). Jurnal Ilmiah Teknik Sipil, 14(2), 113126. Jaya, A. A., Yakin, K., & Bustamin, M. O. (2019). Kajian Pengaruh Percepatan Waktu Pekerjaan Konstruksi Terhadap Biaya Proyek Bess Mansion Apartement Surabaya. Ge-STRAM: Jurnal Perencanaan Dan Rekayasa Sipil, 2(2), 69. https://doi.org/10.25139/jprs.v2i2.1930 Kisworo, R. W. (2017). Cost Trade Off Dengan Penambahan Jam Kerja Lembur Dan Jumlah Alat. Matriks Teknik Sipil, (September 2017), 766776. Mandiyo Priyo, M. R. A. (2015). Aplikasi Metode Time Cost Trade Off Pada Proyek Konstruksi : Studi Kasus Proyek Pembangunan Gedung Indonesia. 18(1), 3043. Mandiyo Priyo, S. S. (2017). Studi Optimasi Waktu dan Biaya dengan Metode Time Cost Trade Off pada Proyek Konstruksi : Studi Kasus Proyek Jalan Bugel-Galur-Poncosari Cs. Tahap I, Provinsi D.I. Yogyakarta . Semesta Teknika, 20(2), 172186. Muhyi, A., & Hasan, N. (2018). Percepatan Proyek Menggunakan Metode Time Cost Trade Off Pada Proyek Jembatan Krueng Tingkeum Kabupaten Bireuen A-165 A-166. 2(1), 165170. Priyo, M., & Risa Anggriani Paridi, M. (2018). Studi Optimasi Waktu dan Biaya dengan Metode Time Cost Trade Off pada Proyek Konstruksi Pembangunan Gedung Olah Raga (Gor). Semesta Teknika, 21(1), 7284. https://doi.org/10.18196/st.211213 Setiawan, B. B., Teknik, J., Universitas, S., Jakarta, M., Jurusan, D., Sipil, T., & Muhammadiyah, U. (2012). Analisis Pertukaran Waktu Dan Biaya Dengan Metode Time Cost Trade Off ( Tcto ) Pada Proyek Pembangunan Gedung Di Jakarta. Jurnal Konstruksia, 4(1), 2534.


Refbacks

  • There are currently no refbacks.