Analisis Aliran Daya Pembangkit Hybrid (Photovoltaic/Diesel) Pada Menara Mercusuar Di Pulau Pandang
Abstract
Study of power flow analysis to obtain information about the flow of power or voltage in an electric power system. As time goes by and the number of tourists on Pandang Island, especially in the development and change sector, will also increase, the amount of burden incurred will also increase, so that a good initial design is no longer suitable for the current load. For this reason, it is necessary to analyze the power flow in order to determine the condition of the electric power system. The benefits of this research are also for planning evaluation if there will be additional burden innovations. In this study, ETAP Power Station 19.0 software was used using Newton Raphson for power flow simulation. The results obtained in the Etap simulation are 37% generating load with a total active power of 10.35 KW, reactive power of 6.85 Kvar, and apparent power of 12.42 KVA. This research also increases the load by 4,800 watts, where the photovoltaic generator must increase the photovoltaic capacity from the previous 10.26 kw to 13.29 kw, therefore solar cell panels will be added as many as 8 panels.
Keywords
Full Text:
PDFReferences
Anggriana, K. (2015). Analisis Perencanaan Dan Pengendalian Persediaan Busbar Berdasarkan Sistem Mrp (Material Requirement Planning) Di Pt. Tis. Penelitian Dan Aplikasi Sistem Dan Teknik Industri, 9(3), 320–337.
Chamdareno, P. G., & Hilal, H. (2000). Analisa Pembangkit Listrik Tenaga Hybrid Pltd-Plts Di Pulau Tunda Serang Banten. 1(1), 37–44.
Dedisukma, D., Sunanda, W., & Gusa, R. F. (2015). Pemodelan Sistem Pembangkit Listrik
Hybrid Diesel Generator Dan Photovoltaic Array Menggunakan Perangkat Lunak Homer (Studi Kasus Di Pulau Semujur Kabupaten Bangka Tengah). Jurnal Ecotipe (Electronic, Control, Telecommunication, Information, And Power Engineering), 2(2), 10–17. Https://Doi.Org/10.33019/Ecotipe.V2i2.35
Destrinanda, H., Yoswaty, D., & Zulkifli. (2018). Kajian Potensi Ekowisata Bahari Di Pulau Pandang Kecamatan Tanjung Tiram Provisi Sumatera Utara. Fakultas Perikanan Dan Ilmu Keluautan Universitas Riau. Riau., 5, 1689–1699.
Djalal, M., Chandra, Y., Yunus, M., & Nauwir, H. (2014). Penyelesaian Aliran Daya 37 Bus Dengan Metode Newton Raphson (Studi Kasus Sistem Interkoneksi 150 Kv Sulawesi Selatan). Jurnal Teknik Mesin Sinergi, 12(1), 35–49.
Elektro, J. T., Islam, U., Sultan, N., & Kasim, S. (2011). Desain Pembangkit Listrik Hybrid ( Plts / Diesel ) Untuk Meningkatkan Pelayanan Kesehatan. 10(1), 15–21.
Elektro, T., Elektro, T., & Brawijaya, U. (N.D.). Studi Analisis Pembangkit Listrik Hybrid (Diesel- Angin) Di Pulau Karimun Jawa. 1–8.
[ Eriyanto, E. (2017). Evaluasi Pemanfaatan Plts Terpusat Siding Kabupaten Bengkayang. Elkha, 9(1), 35. Https://Doi.Org/10.26418/Elkha.V9i1.21676
Hafid, A., Abidin, Z., Husain, S., Umar, R., Prodi, D., Elektro, T., Teknik, F., Muhammadiyah,
U., Prodi, D., Elektro, T., Negeri, P., & Makassar, U. (2017). Analisa Pembangkit Listrik Tenaga Surya Pulau Balang Lompo. 14(1), 6–12.
Hakim, L., Suyono, H., & Dachlan, H. S. (2018). Analisis Injeksi Pembangkit Hybrid Tenaga Surya-Angin Pada Sistem Gi Sengkaling Penyulang Pujon. Jurnal Eeccis, 11(1), 14–19.
Hamzah, S. R., Irianto, C. G., & Kasim, I. (2019). Sistem Plts Untuk Pompa Air Irigasi Pertanian Di Kota Depok. Jetri : Jurnal Ilmiah Teknik Elektro, 17(1),
Rimbawati, Azis Hutasuhut, A., & Chaniago, Y. (2018). Analysis Of Hybrid Power Plant Technology Using Data Weather In North Sumatera. International Journal Of Engineering & Technology, 7(4.7), 481. Https://Doi.Org/10.14419/Ijet.V7i4.7.27364
Https://Doi.Org/10.25105/Jetri.V17i1.4788
Hannan, M. A., Ghani, Z. A., Hoque, M. M., Ker, P. J., Hussain, A., & Mohamed, A. (2019). Fuzzy Logic Inverter Controller In Photovoltaic Applications: Issues And Recommendations. Ieee Access, 7, 24934–24955. Https://Doi.Org/10.1109/Access.2019.2899610
Irawati, R., Ketenagalistrikan, P., Baru, E., Energi, K., Ciledug, J., Kav, R., & Lama, C. K. (2012). Hybrid Power Plant Analysis To Fulfill The Electricity Need In Pramuka Island. 11(2), 81–92.
Nigara, A. G., & Primadiyono, Y. (2015). Analisis Aliran Daya Sistem Tenaga Listrik Pada Bagian Texturizing Di Pt Asia Pasific Fibers Tbk Kendal Menggunakan Software Etap Power Station 4 . 0. Jurnal Teknik Elektro, 7(1), 2–5.
Rahayu, M., & Aryani, Y. A. (2015). Pemahaman Guru Akuntansi Tentang Sak-Etap, Prestasi Belajar Dan Penyerapan Lulusan Sesuai Bidang Akuntansi: Bukti Empiris Dari Kota Madiun. Assets: Jurnal Akuntansi Dan Pendidikan, 4(2), 99. Https://Doi.Org/10.25273/Jap.V4i2.679
Subarkah, R., Heryana, G., & Widiawaty, C. D. (2020). The Development Of Photovoltaic
Application In Indonesia: A Review. Asais 2019, 108–113.
Https://Doi.Org/10.5220/0009906101080113
Walangare, K. B. A., Lumenta, A. S. M., Wuwung, J. O., & Sugiarso, B. A. (N.D.). Rancang Bangun Alat Konversi Air Laut Menjadi Air Minum Dengan Proses Destilasi Sederhana Menggunakan Pemanas Elektrik. E-Jurnal Teknik Elektrodan Komputer, 1–11.
Wisnu, A. (2016). Perencanaan Pembangkitan Listrik Tenaga Surya (Plts) Berkapasitas 1200 Watt Untuk Mengoperasikan Peralatan Sistem Informasi Aktifitas Masyarakat Desa Singosaren
Imogiri Bantul Yogyakarta. Jurnal Elektrikal, 3(1), 59–71.
Https://Ejournal.Akprind.Ac.Id/Index.Php/Elektrikal/Article/View/2482
DOI: https://doi.org/10.30596/rmme.v6i2.14224
Refbacks
- There are currently no refbacks.

This work is licensed under a Creative Commons Attribution 3.0 License
Jurnal Rekayasa Material, Manufaktur dan Energi is abstracting & indexing in the following databases:
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Statcounter View My Stats RMME